RPO(Renewable Purchase Obligations)- Where are we??

Posted on Updated on

Microsoft Word - 2.doc
Introduction of REC(https://www.recregistryindia.nic.in/index.php/general/publics/AboutREC) trading framework has been a significant step in 2010,transforming the renewable energy market to go for market based modelled approach. Success/ Failure of the REC Trading framework can be gauged from the inventory being built up in monthly trading sessions. Of the 712792 RECs put up for sale in the two power exchanges in Sep 2012 session, about 450000 remained unsold and moreover 37% of the REC holders didn’t participate in the trading session at that time. This growing demand supply mismatch is giving alarming bells to the project developers and various potential investors who are eager to invest in RE sector in the near future.
REC mechanism seeks to expand its horizon from resource rich states to the deficit states but the key factor which will lead to success of REC is the RPOs by various obligated entities. Nonetheless state power regulators need to play a proactive role in the development of REC market. Till date all states except Arunachal Pradesh and Sikkim have declared their RPOs explicitly(http://ceew.in/pdf/Appendix_F-Renewable_Purchase_Obligation_for_States.pdf).
A survey was conducted to gauge the total renewable energy capacity of states,RPOs declared by them, CUFs of various renewable sources of energy. It has been analysed that only 4 states -Tamil Nadu, Gujarat, Karnataka and Maharashtra have significant wind power installations and RPOs higher than those required in 2010-11 and 2011-12.For eg Tamil Nadu needed about 4000MW of renewable energy capacity to meet its RPO of 14 % and it has already installed capacity of 4908MW.Except these states, rest of them were unable to meet their solar RPOs.

Weak Links
-There is huge inconsistency in RPO norms across the states. NAPCC,2008 targets 5% of the total grid purchase to be achieved through renewable energy. However in the absence of national level RPOs, states have been fixing their own targets depending upon the availability of renewable energy in that particular area.
-Another risk that is quite prominent as far as REC market is concerned- regulatory capture by the obligated entities which further skews the market against developers and investors. Certain states have been revising their RPOs targets in a downward trend for e.g Tamil Nadu(wind rich state) revised from 14% (2010-11) to 10% (2011-12).According to regulators, unrealistic targets imposed by some state regulators could set a wrong precedent not only for the state. Similarly, in April 2012, MP Power Trading Company Ltd. requested MPERC to waive RPO targets for solar energy for 2011-12 and 2012-13 because no solar power plant has been commissioned in MP and solar RECs were not available for trading on any one of the exchanges.
-RPO setting in most of the states is based on the assessments that are outdated. Therefore, they are set much lower than what could be feasible. Some stake holders are worried about the impact on tariff due to these targets. Like a study conducted by CRISIL along with CERC indicated that compliance with NAPCC target will have a marginal tariff impact of Re 0.01/unit/consumer ,reducing every year to reach Re 0.005/unit/consumer by 2017.
-Another risk that is anticipated by developers is lack of visible long term RPO trajectory. Only 7 states(AP,karnataka, Delhi, HP, Kerela, Maharashtra, Odisha) have declared their RPO trajectory till 2015-16 or beyond.
Limited Focus on CPPs and Open Access consumers
While most of the states have amended their regulations to include open access customers and CPPs under the purview of RPO but still there are some states which have not notified their OA and CPP consumers to meet RPOs. The glim scenario can be seen from the trading of RECs over IEX in which over 90% of the participants are DISCOMs and there have been very few CPPs and Open Access users. But there are states like Karnataka i.e KPTCL directed OA users in the state to fulfill 5% RPO for 2011-12.Similary Chattisgarh has also notified CPPs to provide RPO compliance on monthly basis.
Small Beginnings
Recently Rajasthan high court dismissed an appeal raised by Hindustan Zinc, Ambuja Cements etc that had challenged RPO regulation enacted by RERC. The petitioners stated that RERC did not have authority to pass the RPO regulation and impose a surcharge(penalty) as CPPs and OA were completely de-licensed under EA 2003.However Jaipur bench of High court rejected the petition stating the exact meaning of word ‘total consumption’ as total consumption in the area of distribution licensees in all modes. One of the reason for non compliance is the lack of incentive mechanism to support RPO implementation.
Supportive Measures
-A key stumbling block in the implementation of RPO is the financially strained DISCOMs. Burdened with over 2 trillion of losses, how can one expect DISCOMs buying costly RECs? However a recent development is the Debt restructuring for the DISCOMs(http://powermin.nic.in/whats_new/pdf/Financial_restructuring_of_State_Distribution_Companies_discoms_Oct2012.pdf)
-Another encouraging trend is that several DISCOMs have been facing losses due to their inability to hike tariffs but recently over 17 states have revised their tariffs giving a good signal to the market stabilization for RE.
Need to Improve REC Market Design
-There is lack of visibility in floor and forbearance price beyond the initial five year period because only non PPAs based sales are eligible for RECs.
-REC trading is restricted to auction markets and can be conducted only on a “once through” basis, thereby not permitting forward contracting and liquidity reduction.There is a sheer need of secondary trading market,which both the exchanges as well as industry players have been seeking for some time.
-Finally compliance window has to be shortened to a quarter or half year to ensure that there is continuous procurement action on obligated entities.

Thus,REC markets will fail to bring the desired results unless regulators are empowered to enforce the RPOSs and DISCOMs are allowed to function as independent power utilities rather than as an arm of government.

References: Power Line Magazine,MNRE Website, ICRA report on DISCOM bailout,REC registry,RE Connect etc.